ROOFNOW™ Ontario Roof Retrofit Planning
Replacing Cedar and Wood Shingle Roofs with Metal in Greater Sudbury, Ontario
Assess old wood roofing, ventilation spaces and deck conditions before designing a permanent metal replacement.
Understand the complete existing assembly
Cedar shakes and wood shingles may be installed over boards, spaced sheathing, battens or later reroofing layers. Moisture, splitting and concealed fasteners can make surface appearance a poor guide to the supporting deck. The retrofit plan should identify the full assembly before selecting underlayment or attachment.
A reliable scope separates investigation, removal, temporary protection, structural or deck repair, underlayment, permanent metal and restoration of adjacent walls or drainage. It also defines how concealed changes are documented and approved.
Conditions to examine
- Wood type, age and number of layers
- Solid deck, spaced boards or battens
- Moisture staining, decay and attic ventilation
- Chimney, valley and wall-flashing conditions
Retrofit mistakes to avoid
- Covering decayed wood without investigation
- Assuming spaced sheathing supports a new system
- Leaving combustible debris in concealed cavities
- Reusing brittle wall and chimney flashings
Inspect before choosing the replacement
Lift representative areas at eaves, valleys and penetrations to confirm layers and attachment. From the attic, look for daylight, staining, soft boards and blocked ventilation. Document whether the wood roof is the original drainage surface or sits above older materials.
For a cedar shakes or wood shingles project in Greater Sudbury, record roof zones, slopes, penetrations and prior repairs with photographs. Surface appearance alone cannot confirm the deck, moisture or attachment beneath it. The quotation should state the investigation completed and the assumptions that remain.
Plan removal and daily weather protection
Plan removal in manageable weather-tight sections. Dry wood debris can scatter easily, so ground protection, containers and daily cleanup matter. Any suspect material or special disposal condition should be identified and handled through the appropriate project-specific process.
Agree on material access, debris containment, landscaping protection and the area that can be safely opened each day. Temporary dry-in needs positive laps, secure terminations and drainage. It should not become an indefinite substitute for the permanent roof.
Prepare the deck and roof enclosure
After removal, verify that boards are sound, aligned and suitable for the selected metal system. Add or replace structural sheathing only according to the approved design. Correct air leakage, insulation gaps and ventilation paths while the roof is open.
Before covering the substrate, verify flatness, fastening, dry condition and all required blocking. Coordinate insulation, air sealing and ventilation where the opened roof makes deficiencies visible. Photograph the prepared deck and concealed repairs for the closeout file.
Build new transitions instead of copying old ones
New eave, valley, chimney and wall details should connect to the actual deck and water-control layers. Do not reproduce old face-sealed joints merely because they appeared dry. Photograph concealed work and keep a record of removed layers.
Eaves, rakes, valleys, walls, chimneys and penetrations must match the selected system and finished assembly thickness. Confirm measurements after demolition where conditions were concealed. Future service should not require destructive access to unrelated roof areas.
Quotation and closeout checklist
- Identify every existing roof layer
- Define removal and disposal limits
- Describe deck-repair authorization
- Name the exact metal system and finish
- Detail flashings, drainage and ventilation
- Provide photographs and product records
Compare proposals using the same boundaries. Clarify permits or project-specific reviews, temporary protection, site cleanup, wall restoration, accessories and exclusions. At closeout, inspect the complete roof and keep surplus material, colour codes, warranty information and concealed-work photographs.
Frequently asked questions
Can metal be installed directly over cedar shakes or wood shingles?
Sometimes an overlay may be technically possible, but only after confirming layers, moisture, substrate, attachment, slope, edges and product requirements. This page does not replace a site assessment.
When should final metal measurements be taken?
After the substrate and critical transitions are verified. Concealed conditions can change plane lengths, edge heights and custom flashing dimensions.
What should homeowners keep after the project?
Keep the proposal, change records, product identifiers, warranty documents, deck and flashing photographs, care guidance and labelled surplus material.
Plan the replacement from the deck outward
ROOFNOW™ can assess the existing roof and prepare a project-specific permanent metal-roof scope.
Planning note: General educational guidance only. Confirm structure, materials, moisture, disposal, product requirements and project-specific approvals with the responsible professionals and authorities.